Orange has announced a partnership with Reservoir Sun, a pioneer in self-supply solar energy systems. The aim of this arrangement is to build a photovoltaic power plant at the major satellite communications station Bercenay-en-Othe (Aube), in order to provide environmentally favorable outcomes for France and Europe. The communications corporation is shifting its usage toward renewable energy sources and speeding up the process by utilizing solar energy in its tertiary and technical facilities. The solar energy farm is scheduled to be completed in 2025. A surface area of 50,000 square meters will be occupied by the farm. The power plant, which has a 5 MW capacity, 1 MW for self-consumption and 4 MW for reinjection, will provide 20% of the site’s energy requirements. Additionally, using low-carbon energy from the sun will reduce CO2 emissions by nearly 100 tons per year. An environmental impact analysis study will be conducted…
Latest Posts:
- Darryll Dewan Unveils Top Data Center Trends for 2024
- A quick roundup of the news in Telecoms | Week #17
- HMD Launches Repairable ‘Pulse’ Smartphones Under Own Brand
- Qualcomm Unveils Snapdragon X Plus Platform for PCs, Promising Superior Performance
- AT&T Reports Strong First Quarter Despite Dip in Headline Figures
- Digital Catapult Launches Outdoor Testing for Open RAN Innovation
- Navigating Meta’s Ambitious AI Roadmap Amid Investor Concerns
- Telecom Operators Leverage Satellite Tech for 5G Expansion, Market Growth Yet to Surge
- Web O.No: Metaverse and Web 3.0 Stunted by Internet Chaos, Warn 87% of Business Leaders
Tag