The UK’s first live wind and solar-powered mobile phone mast has been activated in Pembrokeshire (Wales) by Vodafone UK. The self-powered mast will provide 4G service to the community of Eglwyswrw and will be powered by a wind turbine, solar panels and on-site battery storage. The new mast contributes to Vodafone’s goal of achieving net zero emissions by 2027 for its UK operations. The mast is meant to eliminate the requirement for a connection to the national energy grid, a strategy that will assist in delivering connectivity in rural and distant places that are now without those critical services. The mast is equipped with a one-of-a-kind wind turbine that can generate electricity even in low wind conditions and can be deployed without the need for electrical connections. This infrastructure is also extremely quiet, making it ideal for installation in sensitive locations. The study is being carried out…
Latest Posts:
- What is VoIP automation?
- Organizations’ cybersecurity readiness is troubling, says Cisco
- Orange Belgium gets approval for acquisition of VOO
- Fusion Connect launches new features for MS Teams Calling Service
- A quick roundup of the news in Telecoms | Week #11
- OpenAI unveils GPT-4 with improved accuracy and visual input
- DIDWW SIP Trunking Solution Now Available on Genesys AppFoundry
- Cloudflare names AT&T the most commonly impersonated brand
Tag